6x10m Tunnel Dome - Sound isolated Insulated building
Dome size m/ft_ Ø12m / 39.4ft, Floor area m2/sqft_ 106m2 / 1141sqft,
Delivery:
- Europe. Delivery to door by truck, 10 weeks.
- Outside Europe by sea. Sea freight delivery to port terminal, 20 weeks.
- Outside Europe by air. Air cargo delivery to airport terminal, 10 week delivery.
Outside Europe custom clearance not included. We ship from our production facility in Vilnius, Lithuania, European Union. For more information please read our Shipping Policy.
Sound-isolated Insulated Dome the complete set included:
- Design drawings and assembly manual – 50 pages PDF
- Water resistance Plywood façade. The façade of the dome is multi-layered. External coating: Plywood, insulating PIR 50mm.
-
T-STAR system painted steel frame. Galvanized screw.
The insulation layer is inside, between interior plywood panels and external plywood panels.
-
Insulation: Triangle panels PIR 50mm. Fireproof class B-s1, d0.
FF-PIR thermal insulation panels are made of rigid polyisocyanurate (polyurethane) foam (PIR) core and are covered with multi-layer aluminum foil on both sides.
The extremely low thermal conductivity of these panels (λD = 0.023 W/(mK)) allows the thickness of structures to be reduced by up to 2 times. This not only saves space and usable area on the premises but also reduces the weight of the structure.
- Interior finishing: Birch plywood triangular panels are attached to the frame with thin nails. Plywood surface - natural untreated wood. If you want to improve the interior, you can paint or varnish the plywood after installation.
- O-Door shaped entrance, Glass/PVC double door.
Optional:
- Quick-install modular terrace
- Heavy-duty modular terrace
Designed and developed, the Sound isolated Insulated Dome envelope is suitable for all-year-round use in different climates, high loads of rain, and snow. Dome constructions are calculated to withstand snow load up to 3 kN, and wind load up to 34 m/s. If you need a higher load resistance, ask for advice.
5-layer custom-designed insulated envelope made to extract moisture from the envelope itself. Air permeability and micro-ventilation systems are provided for moisture removal.
These are semi-permanent buildings.
Installation:
We provide instructions and consultation for the installation process. Simple cordless carpentry tools and scaffold tower. 4 experienced installers can install the dome in 5-6 working days.
Workflow:
- Frame installation.
- OSB triangular panels are installed outside
- Diffuse film is installed over OSB
- Airflow spacers are installed above the diffusion films
- Entrance box and door
- PVC cover
- Insulation layers from the inside
- Interior plywood triangles
Maintenance:
No special maintenance is required in warm weather.
Important:
This version of the dome is very airtight. A powerful adjustable ventilation system is required to control the humidity inside the dome.
Have a question?